Home » Projects » Rietkloof

Rietkloof WEF

Rietkloof WEF is located near the town of Matjiesfontein in the Western and Northern Cape Provinces. The site can be accessed via the R354 that connects to the N1 between Matjiesfontein and Laingsburg. The R354 is the main arterial road providing access to the project area. There are a number of existing gravel roads providing access from the R354. The project consists of up to 58 wind turbines and electricity will be evacuated through the Bon Espirange substation which connects to the Komsberg Main Transmission Substation. Originally developed by G7 Renewable Energies and later sold to Red Rocket, Rietkloof reached financial close on 24 February 2023 under bid window 5 of South Africa’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) and should start construction in 2023.

Quick facts:

Nominal Capacity 140 MW  
Technology Up to 60 Turbines TBD
Annual Electricity Generation TBD  
Equivalent household consumption TBD  
Carbon Emission Reduction TBD  
Equivalent full load hours TBD  
Capacity Factor TBD  
Commercial Operation Date Q1 2022  

 

In the Press:

Engineering News

Additional Media:

Photos

Maps