Home » Projects » Brandvalley

Brandvalley Wind Farm Facility

The Brandvalley WEF is located near the town of Matjiesfontein in the Western and Northern Cape Provinces. The site can be accessed via the R354 that connects to the N1 between Matjiesfontein and Laingsburg. The R354 is the main arterial road providing access to the project area. There are a number of existing gravel roads providing access from the R354. The project consists of up to 58 wind turbines and electricity will be evacuated through the Bon Espirange substation which connects to the Komsberg Main Transmission Substation. Originally developed by G7 Renewable Energies and later sold to Red Rocket, Brandvalley reached financial close on 24 February 2023 under bid window 5 of South Africa’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) and started construction in 2023.

Quick facts:

Nominal Capacity  147 MW  
Technology TBC TBC
     
Equivalent household consumption TBC  
Carbon Emission Reduction TBC  
Equivalent full load hours TBC  
Capacity Factor TBC  
Commercial Operation Date TBC  

 

In the Press:

ESI

SAWEA

Additional Media:

Photos

Maps

Video